Skip to main content
Detroit & area concrete contractor · Free written estimates
(313) 888-8371

EV Battery · Clean Room

Sealed Clean Room Flooring for Detroit Battery Facilities

Battery production zones demand floors that hold particles in place, release no chemical vapor, and maintain the airflow geometry the room depends on. Detroit Concrete builds seamless epoxy and urethane systems engineered for ISO clean room specifications, with particle verification, ESD grounding where needed, and transition details that keep the room's sealed boundary intact. Free written estimate on every project.

  • Seamless, particle-verified install
  • ESD-grounded where required
  • Free written estimate, firm schedule

The particle problem

Why Standard Floors Fail in Clean Room Environments

ISO clean room ratings depend on particle count per cubic meter. Every surface in the room either adds to or subtracts from that budget. Uncoated concrete continuously sheds microscopic particles under foot traffic and equipment movement, consuming the room's particle allowance before production even starts.

We install smooth seamless epoxy or urethane systems matched to your ISO class, with chemistry that does not off-gas at operating temperature and a grounding scheme for ESD-sensitive zones. The installation follows clean room protocol: contained prep with HEPA filtration where required, sealed wall-to-floor transitions, door-frame integration, and post-cure particle verification to confirm the floor's contribution stays within budget.

Our approach integrates with the full EV battery flooring scope and connects to adjacent ESD manufacturing floors that share the same slab. We coordinate transitions so the clean room boundary stays intact.

Recent work
seamless clean room floor in a Detroit battery production facility
particle count verification documentation for clean room floor

Installation sequence

How We Build Clean Room Flooring in Detroit

  1. Determine ISO class and material spec

    We identify the target ISO class, the particle budget the floor must meet, any ESD or grounding requirements, and the off-gas chemistry limits for your process. Material selection is locked to the class before prep begins.

  2. Prepare slab under controlled conditions

    The concrete slab is prepped using HEPA-filtered or sealed-prep methods to avoid contaminating adjacent spaces. Surface is ground to the system profile, cracks are filled with clean-room-rated repair material, and the slab is verified clean before coating.

  3. Apply seamless epoxy or urethane

    The smooth seamless system is applied without seams across the room footprint, with topcoat selected for the particle-shed and off-gas specs your process requires. Cove base at walls and sealed penetrations are part of the same continuous application.

  4. Verify particle count and ESD resistance

    After cure, particle count testing confirms the floor's contribution is within the ISO budget. ESD resistance is verified where required. Certification documentation is delivered for your clean room commissioning file.

The failure point

How Floor Transitions Compromise Clean Rooms

A perfect seamless floor across the room footprint can fail at the boundaries: the doorway to a non-clean space, the wall-floor junction, the pipe or cable penetrations. We detail every transition with seamless cove, sealed penetrations, and integrated door frames so the floor's clean integrity extends to the room perimeter.

Coordinate with EV battery services across your facility and with chemical-resistant flooring in adjacent production zones that may share the same slab.

Quote a clean room floor
clean room floor with sealed transitions and ISO verification documentation
Seamless Across room
Verified Particle + ESD
Free Written estimate

Related EV battery services

Explore Other EV Battery Flooring Options

Clean room is one of two EV battery services we offer. See the other.

All EV battery services

Common questions

Clean Room Floor Questions, Answered

ISO class, particle budget, off-gas chemistry and transition details.

Multiple classes from less strict to more strict, with the floor system spec matched to the class. We confirm the target class up front and select the matched system; higher classes require lower-particulate materials and stricter install discipline.
Yes, significantly. A standard floor sheds particles continuously; a properly specified clean-room floor contributes far less. In an ISO-rated environment, every surface counts toward the particle budget.
Floor systems can off-gas trace chemistry that contaminates sensitive processes. We use chemistry rated for low off-gas in clean room applications, verified by the manufacturer for your specific class requirement.
Yes, transitions are where most clean room floors fail. We detail every transition (wall, door, penetration) with seamless cove and sealed integration so the floor's clean integrity holds at the room boundary.
Per room, typically a week or more depending on size and ISO class. The cure window before clean room commissioning adds additional time. The full schedule is in the quote and built around your commissioning calendar.

Client reviews

What Detroit Operations Say About Their Clean Room Floors

★★★★★ 4.9 · 87 reviews on Google
Read all reviews →
★★★★★

ISO-class verified at commissioning with our floor as part of the particle budget. Hit class, room ran first try. The seamless transition detail at the door made the difference.

Z. J5
Clean Room Operations, Detroit
★★★★★

Off-gas verification on the floor chemistry for our sensitive process. No detectable contamination at the production analytical limit. Spec matched the process requirement exactly.

Y. J5
Process Engineer, Warren
★★★★★

Multiple clean rooms across our facility, each at different ISO classes. They specced per room rather than one system everywhere; class targets hit in every room first commissioning.

Q. J5
Facility Engineer, Ann Arbor
★★★★★

Documentation package supported the validation file. Material specs, install method, particle verification all included. Auditor signed off without revisions.

X. J5
Validation Lead, Sterling Heights

Ready to start

Get a Free Clean Room Floor Quote

Provide the ISO class, room dimensions, and your commissioning timeline, and we will spec the matched system and deliver a written quote within one business day.

We'll assess the clean room and send a written quote within one business day.